SolarWorld builds the first ever 1-axis tracker grid-tied system
PG&E Kerman Substation
Fresno, CA
Ground mount installation
Completed 1993
Installed by ARCO Solar (now SolarWorld)
System Details:
- 500 kW
- 1-axis sun tracker grid-tied system
June 22- 24
Los Angeles, CA - Los Angeles Convention Center
Dwell on Design